
Survey day on the Mendocino bluff, before a single line was drawn
We survey the ground before we draw a line
Most landscapes fail for reasons that were visible on day one: the wrong soil, water arriving faster than the design assumed, a maintenance load nobody costed. We start with measurement, so the drawing answers the site rather than the mood board.
- Survey before opinionWe measure soil, hydrology and light before anyone draws a line. Taste comes later.
- Build what can be maintainedA landscape your grounds crew cannot keep is a landscape that has already failed.
- Stay through establishmentWe are on site for the five years that actually decide whether a planting works.